Situation.

When this property was acquired by its present owner, it had a large extended aeration wastewater treatment plant installed under a parking garage, which was just below a number of hotel rooms. Unfortunately, there was no other location for a new plant to be installed. TSG operated and maintained this plant for a number of years until the owner decided to proceed with an expansion and upgrade of the existing plant.

Solution.

TSG was retained to design, and build and operate an upgrade of this plant to a 240,000 US gpd membrane bioreactor (MBR) plant within the existing space. This required a thoughtful design and carefully planned execution of the installation, which had to occur while the resort was in full operation.

Result.

The project was successfully completed on time and on budget, and TSG now operates this plant on a daily basis, providing high quality effluent for irrigation.